These areas won't have water from Sept. 14 – 20
The management of the Ghana Water Company Limited (GWCL) has announced that there will be an interruption of water supply from Monday, 14 to Saturday, 20 September 2020 to the Eastern part of the Greater Accra Region.
This is to enable GWCL engineers to replace close to 2 kilometres of a weak session of the main 42-inch diameter transmission pipe-line from Kpong to Tema.
According to a statement issued by the GWCL, on Thursday, 10 September 2020, the replacement on the Kpong to Tema pipeline will cause the company “to lose several volumes of water on a daily basis and consequently having a serious impact on the volumes available for consumption.”
The GWCL, therefore, entreats “consumers in Accra, especially consumers in the eastern part of the metropolis to store enough water for consumption during the period of the shutdown.”
The affected areas will include “Afienya, Apollonia, Gbetsele, Ashaiman, Katamanso, Kakasunanka, Adjei Kojo, East Legon Trasaco, all the communities in Tema (Community 1 to 25), Free Zones enclave, Tema Industrial Area, Dawhenya, Prampram, Spintex Road, Batsonaa, Coca Cola, Kasapreko, Manet, Lashibi, Klagon, Sakumono, and surrounding communities…”
The GWCL assured the “general public, that the necessary equipment, logistics and personnel required to execute the project have been secured and as a result can assure our cherished consumers that, barring any technical hitch, the project must be completed on schedule.”
It further assured the public that water supply will “resume immediately the project is completed.”
Meanwhile, the GWCL noted that it has put in place measures to serve affected areas to mitigate the impact of the interruption of water supply which includes “the government’s COVID-19 free water reservoirs will still be filled with water tankers to enable consumers to fetch for free, essential service providers like the hospitals and schools will also be served with water tankers.”
Also, “Most importantly, consumers should/must store water ahead of the shutdown to reduce the impact of the shutdown."
The GWCL apologised for the inconvenience that the interruption will cause and pleaded with customers “to bear with the situation since the project is meant at improving on services to the public.”
Source: classfmonline.com
Trending News
Dr Randy Abbey appointed Acting Cocobod CEO
20:09NDC Organizers in Central Region urge Mahama to revive abandoned projects
15:31Parliamentary vetting of regional ministers-designate starting on Jan 23
14:16Ministry of Foreign Affairs list persons to return their diplomatic and service passports
04:24Parliament approves Ato Forson, Dominic Ayine, John Jinapor for sector ministries
03:16Mahama’s commitment to 60 ministers shows he’s a promise keeper - Kwame Agbodza
14:36Bright Simons: An int'l bank has warned President Mahama about a scandalous potential minister
14:02Ho West MP challenges Minority's stance on ORAL Committee summons
03:11Yusif Sulemana urges constituents to maintain peace after ministerial omission
18:47GCAG to President Mahama: Declare state of emergency over our water bodies, engage military
15:19